    SEIC is the Côte region's long-standing supplier of electricity to homes and businesses in its six shareholder municipalities. 

    Rates

    Billing

    Remote heating

    The district heating system (DHC) is based on a simple principle: centralized energy production.

    Electricity producer

    Creating your own electricity? Make the most of the energy you produce with our various solutions. SEIC buys back your surplus electricity reinjected into the grid at the sale price.

    Eco-energy range

    SEIC offers you forward-looking solutions based on hydraulic, photovoltaic, wind and biomass sources.

    Grid connection

    and more

    > Previous rates

    > Renewable energy production

    > Renewable heat production

    > EnergeÔ Vinzel project

  • ENERGY TRANSITION

    Energy transition

    Increase your level of self-consumption with our solutions and reduce your electricity bills.

    Photovoltaic panels

    Storage battery

    The storage battery increases your level of self-consumption and promotes energy independence. 

    Heat pump

    The heat pump system converts the energy in the air into heat, enabling environmentally-friendly heating and hot water production.

    Charging stations

    Whether you're a tenant or a homeowner, SEIC's specialists can offer you a safe, fast and scalable recharging solution that's right for your home. 

    Grouping for own consumption

    Share and add value to your solar energy by creating your Regroupement pour la consommation propre (RCP).

    Self-consumption community

    Create a self-consumption community and let members benefit from cheaper, 100% renewable, locally-produced electricity.  

    and more

    > Optimizing self-consumption

    > Energy audits

    > Studies and projects

  • INSTALLATIONS

    Installations

    Whether you're renovating, converting or building a new property, we can handle all your electrical installation projects. 

    Electrical installations

    New construction, conversion or renovation, SEIC is your partner for all your electrical projects.

    Security

    Security and video surveillance systems to protect your loved ones and property. 

    Building automation

    Optimize your energy consumption and reduce your electricity bills by automating your home.

    Telephony

    We offer telecommunication solutions tailored to your needs, your environment and your budget. 

    Computer network

    Reliable, high-performance IT infrastructure solutions tailored to your needs and environment.

    and more

    > Studies and projects

    > Customer store

  • MULTIMEDIA

    Multimedia

    Enjoy an enriched, personalized multimedia experience tailored to your needs.

    Combo Offers

    Mobile

    Television

    Optical fiber

    With fiber optics, enjoy blazing speed, constant throughput and an incomparable online experience!

    Wi-Fi Plume HomePass®

    Boost your Wi-Fi connection with the Plume HomePass® solution and its SuperPods.

    MobiZen

    Protect your loved ones with MobiZen, the alarm watch: immediate assistance in case of emergency and real-time monitoring via the app. 

    Our partnership with net+

    and more

    > MYNET+

    > Customer store

  • SEIC & ME

    about SEIC

    Follow our news, discover our tips and find answers to all your questions. Find out more about SEIC, our current vacancies and apply for sponsorship.

    Background image showing a "&".

    Our news

    The SEIC company

    Our missions and values

    Careers

    Our references

    Our advice and information

    Service areas

    Frequently asked questions

    Customer store

    Sponsorship

    my steps

    Log in to your SEIC and MYNET+ customer areas, inform us of your move, request your connection to the electricity grid and find out about breakdowns and maintenance of our services.

    SEIC customer portal

    MYNET+ portal

    Moving

    Contact SEIC

    Network connection

    Network info

    Luminaire failure

    24/7 troubleshooting

SEIC logo
  • SEIC customer portal
  • move
  • 24/7 troubleshooting
  • careers
  • and much more

home - ENERGY - Grid connection

Grid connection

Whether you're building a new property or need a temporary connection for your construction work, you can use our online form to request a connection to the electricity grid. Find out more about the standards met by SEIC's specialists.

connect to the SEIC network

Connection

Connect to the SEIC network

This form is suitable for the new construction of a property or for the temporary introduction of a building site for your work.

" * " indicates required fields

Contact

Owner, developer or architect
Contact person
Contact person
Do you know the electrician's contact details?*

Contact

Planned electrician (if already present)
Contact person
Contact person

Building location / Consumption location

Survey date

Electricity

New connection

Modification of an existing connection

Each additional ampere costs CHF 160 (excl. tax).
CHF 160.- per ampere (excl. tax)
Package according to the list below*
Caution: The ≤ 63A switchboard supplied by the applicant must have passed the electrical safety test and have a meter slot.
Price of temporary connection
<63 ACHF 800.- (excl. tax)
≥63 A and ≤ 160 ACHF 1'600.- (excl. tax)
>160 Aon quotation, minimum CHF 10.00 per ampere (excl. tax)
Type of heating

Means of connection*
Preferred grid connection date
The date must be confirmed at least 2 weeks before the introduction work. The notice of intervention on the metering equipment (IAT) (request for installation of final meters) must be received by us before the final introduction is carried out.
Depending on the equipment and type of plant connected, the customer must send :
  • - Application for technical connection (DRT) in accordance with PDIE" form
  • - installation notice
The appendices must be sent to us:
  • - 1 site plan
  • - 1 exterior layout plan
  • - 1 building plan
Special conditions
  • Means of connection :
    • - ENC-160 type front-mounted enclosure up to 160 A
    • - Subscriber column at property line up to 160 A type KVS-135
    • - In an electrical room in the main LV board on a DIN2 strip
  • Administrative requirements :
    • - Once you have agreed to the terms and conditions listed above, and accepted the estimate for the connection work, we can schedule our intervention.
    • - The contribution to network costs will be billed to you before work begins, and is non-refundable.
    • - Once the connection work has been completed, the final invoice will be sent to you for payment.
  • Technical requirements:
    • - The customer is responsible for all excavation work, installation of the PE pipe supplied by SEIC, backfilling and installation of the signalling mesh for the network cable.
    • - The customer or the company installing the PE pipe must contact our SIT at least 48 hours before backfilling the excavation in order to take the necessary measurements.
    • - All masonry work for the installation of the introduction box or for the concrete base for the KVS column at the property boundary will be at the customer's expense and must be carried out in accordance with SEIC's plans.
    • - For installation in an electrical room on a main LV board, please refer to the PDIE and install in accordance with SEIC's drawings.
Mains connection :
The grid connection point is defined by SEIC, and the temporary installation is carried out at the nearest point. The private cable between the site and the grid connection point is the responsibility of the applicant.
  • - Up to 160 A: connection in a low-voltage distribution cabinet.
  • - Over 160 A: direct connection to the nearest transformer station.
Conditions
  • - No work will be carried out by SEIC before payment of the lump sum for the temporary worksite.
  • - The requested intensity may be reduced or refused depending on the local conditions of SEIC's distribution network.
  • - The supply of electrical energy may be refused or cut off if the installation does not comply with the laws, laws, ordinances, standards or technical rules in force, or if there is a risk to the safety of property. The power supply will be restored only after the installation has been repaired by a competent company appointed by the applicant.
  • - The provisional period is two years. After this period, it will be invoiced again at its original price.
Electricity rates
According to the official tariffs applied by Société électrique intercommunale de la Côte SA, available at www.seic.ch.
Applicant's agreement to connect to the network*
Upload files here or
Max. file size: 10 MB.
    This field is used for validation purposes only and should remain unchanged.

    Standards and control bodies respected by SEIC

    Electricity distributor regulations CH (PDIE)

    Consult electricity distributors' regulations

    Can't find the answer to your question? Contact us

    SEIC logo
    Joining forces today for tomorrow

    Avenue du Mont-Blanc 24
    1196 Gland, Switzerland
    Contact us
    Tel: +41 22 364 31 31

    Quick access

    • SEIC customer portal
    • MYNET+ portal
    • News
    • Frequently asked questions
    • General terms and conditions

    SEIC

    • The SEIC company
    • Careers
    • References
    • Sponsorship

    Visit us at

    Facebook-f Instagram Linkedin-in Youtube
    • FR
    ISO 9001 certified company

    Legal notice and data protection

    SEIC © 2025 - All rights reserved
    - Site created by map.ch

    research

    phone

    contact

    emergency

    PORTAIL | my procedures

    • SEIC customer portal
    • space for professionals
    • move
    • 24/7 troubleshooting
    • careers
    • MyNet+ portal
    • grid connection
    • breakdowns and maintenance
    • contact SEIC
    Facebook-f Instagram Linkedin-in Youtube
    • FR

    Avenue du Mont-Blanc 24
    1196 Gland

    Monday to Friday
    8:00 to 12:00 and 13:30 to 17:00

    • MYNET+ portal
    • grid connection
    • breakdowns and maintenance
    • space for professionals
    Congratulations !

    You have found all the hidden pictograms.
    There is just one more step left to validate your participation in the draw and try to win an iPhone 16!